Resume Writing ?
The Following Text Is An Unformatted Professional Resume Sample
From The Writers At The Resume Writing Group, Inc.
This Resume Has Not Been Formatted
ORDER YOUR OWN LETTER-PERFECT, JOB-WINNING RESUME AND IT WILL BE COMPLETED AS SOON AS YOU NEED!
Click HERE!
Yyyyyy x. yyyyyy
607 Summit Ave., #190 │ Arlington, TX 76013
6823650685 │ abc@xyz.com
Objective
Accomplished graduate student seeking a challenging entry-level role in the industrial engineering field.
Summary of Qualifications
Industrial engineer with strong understanding and experience of lean manufacturing, continuous improvement, Kaizen, 5S, SMED, quality control and assurance, supply chain and logistics.
Academic and work history of consistently exceeding performance objectives and working well with colleagues.
Proficient with Microsoft Office and Project; SolidWorks; Minitab; ARENA; MATLAB; SAS; R; SIMIO; WITNESS; Quality Center ALM; and SAP module for Warehouse Management.
Education, Training and Certificates
Master of Science (MS), Industrial Engineering, University
of Texas, Arlington; expected May 2017 (4.0 GPA)
Coursework: Quality Control and Assurance; Manufacturing; Supply Chain & Logistics Management with SAP modules; Operations Research; Simulation; Production Planning; and Inventory Control.
Bachelor of Technology, Industrial Engineering, Pandit Deendayal Petroleum University; earned May 2015
Seminar Presentation, Facility Location Planning and Techniques.
Captain, Soccer Team; 2014-2015.
Six Sigma Green Belt Certified, Institute of Industrial and System Engineers (IISE)
R Programming Certificate, John Hopkins University; earned Sept. 2016
Completed courses through ASQ, IISE and Coursera
Academic Projects
Designed a Request for Proposal (RFP) for a facility plan of a mid-tier grocery warehouse:
Proposed a 3PL Warehouse Management Systems (WMS) after carefully studying various 3PL systems.
Calculated the number of employees that would be needed for each function inside the warehouse.
Determined space requirements for all the components inside the warehouse as well as parking spaces
Created facility layout of the warehouse in AutoCAD and project management plan in Microsoft Project.
Provided pricing for
each function of a warehouse using a transnational pricing method.
Systems Engineer MS Cell Phone Project:
Collected requirements using different solicitation techniques and catalogued such as Papyrus and MagicDraw.
Identified key stakeholders and technical and system specification requirements using GEIA Standard (EIA 632); INCOSE Systems Engineering; SEBoK; and FAA System Engineering standards and processes.
Achieved 30% ROS and 80% POS using crystal ball analysis on a mid-tier phone.
Developed a SPIRIT phone prototype using in-house or purchased components for less than $110, as well as phone wireframes using Justinmind and Adobe Photoshop.
Designed N2, IDEFO, Block, Context, Activity, Flow and SysML diagrams using MagicDraw and iGrafx.
Yyyyyy x. yyyyyy
607 Summit Ave., #190 │ Arlington, TX 76013
6823650685 │ abc@xyz.com
Academic Projects (continued)
Quality Control Engineer:
Discovered bettary heating problem in a cell phone by conducting root cause analysis.
Completed DMAIC studies using Process Map, FMEA, Fishbone Diagrams, Control Chart, SIPOC and SPC to improve process and quality of the cell phones microphone.
Incorporated Lean Six
Sigma methodologies to resolve design and manufacturing problems.
Created a Work Breakdown Structure (WBS) for a Conveyor Belt Project:
Executed all project planning phases (defining, planning, executing and closing) using Microsoft Project.
Identified potential risks related to project and successfully completed risk detection and prevention plans.
Simulation Project:
Applied a 12-step
simulation methodology to design and simulate a medical facility using
witness-to-analyze buffer requirements at various counters and labor requirements
by leveraging WITNESS software.
Regression Analysis:
Analyzed a soccer teams' projected performance and final standings in the league based on various statistics such as possession, pass completion, goal difference and shots on goal.
Work and Internship History
Graduate Teaching Assistant, University of Texas, Arlington Fall 2016
Demonstrate strong communication skills to support students learning about quality systems.
Simulation Engineer, Sardar Vallabhbhai Patel International Airport Aug. 2014-May 2015
Lowered the waiting time 17 minutes for passengers at counters by applying concepts of Queueing Theory and modeling and analyzing passenger flow from entrance to boarding using ARENA simulation software.
Measured and improved the efficiency of a variety of servers inside the terminal.
Continuous Improvement Intern, Windsor Machines Limited Summer 2014
Reduced the make span of the molding process by 10 minutes as a result of leveraging Just-in-time (JIT) lean management and Kaizen methodologies.
Improved productivity and throughput of the production line and assembly using WordPro software tools.
Determined the cost of three different kinds of injection molding machines (Armour, Sprint and Castle).
<< Previous Back to Sitemap Next >>
Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!