Confident, creative and highly driven Project Manager with years of diverse and valuable experience in the glass and glazing field. Possess a proven record of driving the success of important projects that heighten profit levels. Adept at keeping all self-managed efforts within budget and on time. Thrive in being a part of the project process at all phases and watching each initiative develop from concept into reality. Call on strong attention detail, precision and patience to be a successful leader that leads by example. Seeking a Project Engineer or other leadership role that calls for leverage of existing skills, as well as offer the opportunity for further exploration of interest in HILTI.
Core Competencies
Project Management | Supervision | Leadership | Strategic Planning | Scheduling | Documentation & Reporting
Time Management | Organization | Problem Solving | Critical Thinking
Technology Aptitude
Architectural/Drafting: Autodesk: AutoCAD 2002-2012 - Revit, Mac Draft, ArchiCAD, DWG TrueView Conversions. Project Information Management: Planrooms, Box.Net; AEC-Sync - Newforma, Computer Ease (and other internal project tracking systems), Microsoft Project (scheduling)
Graphic Design: Adobe Photoshop, InDesign, Freehand
Microsoft Office: Excel, Word, Outlook, Power Point, and Publisher
Additional: Acrobat/Adobe Acrobat Pro, HILTI (building envelope and layout equipment)
Professional Synopsis
TEPCO Contract Glazing | Estimator, Project Manager (2015-2017)
Served as an Estimator on sold projects such as the DFW Terminal A, the AA Admiral's Club Renovation (Austin Commercial: $450K) AA HQ Cafeteria and Elevator Enclosure (Austin Commercial: $300K)
Oversaw project development for the Notre Dame Stadium (Barton Malow Construction: $2.7M); Miramar Development (Brasfield & Gorrie: $450K) and the SWA Pedestrian Bridge (Hill & Wilkinson: $800K)
Also led completion of the DFW Admiral's Club Renovation, along with Term A, AA (Austin Commercial: $350K)
Alliance Glazing Technologies | Estimator, Project Manager (2011-2015)
Worked in a hybrid role comprised of project management, technician/drafting, fabrication/layout development and field support specific to site layouts and control lines to project grid
Aided in design and constructability of project scope; coordinated all components to complement the larger picture vision
Delivered optimal internal support to Project Managers, shop team/production and field crews, as well as others in need of guidance
Developed and managed the project schedule regarding the General Contractor s schedule; updated as needed; ensured that conflicts were resolved as each project progressed per schedule dates
Maintained project documents including returned submittals from the Architect/General Contractor or final/field shop drawings (F&Ds), distributed to appropriate parties for coordination purposes
Communicated with the client, subcontractors/suppliers, internal shop and field colleagues to maintain continuous communication over the course of each project to uphold positive relationships and the confidence of those dependent on completed work
Delivered related field support and led job site visits periodically to assess progress
Ensured seamless project flow using AutoCAD shop fabrication and field layout
Created highly-detailed AutoCAD drawings per key production/installation goals
Assessed and worked through each project contract, including submittals, specifications and contract documents
Issued Requests for Information/RFI(s) to address unresolved project details
Completed monthly project billings; managed project budget and costs including drafting change orders throughout the project in response to Construction Change Directives
Produced material take-offs/cut lists, as well as handled procurement and sequencing
Completed all purchase orders/releases of material per the project schedule and approvals per the Architect/General Contractor
Aligned with specialty project requirements pertaining to safety, LEED requirements, etc.
Completed the UTD BioEngineering Bldg., Bandera-Preston Tower, UNT Student Union Bldg., West Village Forest City, Choctaw Casino/Durant, Renaissance Hotel Addition and Reunion Tower Renovation during tenure in role
Estimated sold projects with TRT Holdings, Inc. including Brasfield & Gorrie for $1.4 M and UNT College of Law-Beck/Warrior for $700K
Directed project development for SMU New Residential/Dining Commons and Garage with Beck for $2.9M
Yyyyyy x. yyyyyy
Continued
Trainor Glass Company | Project Manager (2011)
Developed and executed a project for the Perot Museum of Nature and Science via Balfour Beatty as a General Contractor, valued at $2.6M; took on this critical project at a time in the schedule when leadership was most important
Worked with material suppliers to complete all shop drawings accurately, with strong attention to detail
Worked collaboratively in the shop to drive accuracy in assembling the KD curtain wall system from Oldcastle
Collaborated with Field Foreman and team to control installation quality; ensured all materials were available, tagged and appropriately labeled for ease of installation
Organized both glass and glazing functions with other subcontractors, the Architect and Engineer each week during the production and installation phase
Guaranteed that all close-out documents/project requirements were precise and completed per General Contractor specifications
Made certain that all contract document requirements were adhered to using specifications for architectural and structural drawings
Completed rough opening shop drawings to provide manufacturers with an accurate starting point; referenced other subcontractors fabrication drawings and releases to aid in drawing development
Guaranteed that all metal and glass abstract shapes were precisely aligned with one another in relation to the overall structure/building; included abstract shapes and features that were a challenge to implement
Coordinated deliveries with the job site schedule, ensured proper equipment was available to meet project needs and organized all final field shop drawings and installation manuals to be available onsite
Jennings Glass Contractors | Project Manager (2008-2011)
Developed projects for the Mount Vernon Independent School District for $750K and the Farmers Branch Animal Adoption Center for $200K, both with Gallagher Construction Services as the General Contractor
Drafted and reviewed shop drawings for projects up to $1M in scope; completed submittals per contract fulfillments in scope, thus ensuring that all elements were accurate and detailed
Completed and released production packets for the Shop Foreman; worked with the Foreman and crew to correctly execute the fabrication and assembly per shop drawings and important documents
Helped ensure that design intent was clear and all official parties agreed on how to proceed and finalize release shop drawings
Communicated all intricacies and important notes to the shop and field crews
Provided material to all suppliers by completing cut-lists, material take-offs, purchase orders and offering permission to move forward based on content in release documents
Sketched and drafted details for special conditions, e.g. pattern glass, metal framing custom shapes and rough openings, as well as obscure die shapes, segmented systems and related abstract shape work
Proved vital in the field installation process as a foremost contact for the Field Superintendent and Field Foreman
Ordered and managed delivery of all required shop drawings, installation instructions, materials, tools and equipment as needed
Earlier Roles
Oldcastle BE Vistawall | Engineering Technician/Drafting (2006-2008)
Weatherl & Associates | Architectural Drafting/Intern (2005-2006)
Central Services, ACU | Architectural Drafting/Inter (2004-2005)
Education
Bachelor s Degree, Fine Art, Abilene Christian University (GPA 3.8, Dean s List)
Associate s Degree, Science/Pre-Architecture, Abilene Christian University
Course, Blueprint Reading Labor Estimating, Glass Association of North America
Certificate, Design Training SAPA
Involvement & Honors
Member, Abilene Home Builders Association | Member, The National Building Association
Recipient, Juanita Pollard Scholarship | Volunteer, Habitat for Humanity | Member, The Kiwanis Club
Member, TGA (NTGA) Xxxxxx Glass Association/North Xxxxxx Division
<< Previous Back to Sitemap Next >>
Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!