Resume Company – The Internet’s Very Best

The Following Text Is An Unformatted Professional Resume Sample

From The Writers At The Resume Writing Group, Inc.

This Resume Has Not Been Formatted


ORDER YOUR OWN LETTER-PERFECT, JOB-WINNING RESUME AND IT WILL BE COMPLETED AS SOON AS YOU NEED!
Click HERE!



Yyyyyy x. yyyyyy

0000 xxxxxx xxxx , xxxx , xxxxx 00000

xxx-xxx-xxxx

abc@xyz.com

Country of Citizenship: United States

SSN: xxx-xx-xxxx

____________________________________________________________________________

 

Job Title:

Department:

Agency:

Job Announcement Number:

 

 

Core Competencies

Long-Term Construction Experience and Heavy Equipment Usage, Environmental Management, Radiation Remediation, Nuclear Hazardous Materials, Hazard Identification, Report Development, Emergency Response, Job Safety Analysis (JSA) Development, Job Hazard Analysis (JHA), Gas Monitoring System Calibration, Safety, IMS/IWM Safety Procedures, Air Monitoring, Proposal/Bid Authorship, Safety Audits, DOE Procedures/Operations/Technical Areas, Union/Non-Union/Sub-Contractor Interface, Personnel Management, Customer Interface, Lock Out/Tag Out, Confined Space Procedures, Hazardous Contingency/Spill Prevention Plans

 

Microsoft Word/Excel/PowerPoint, AutoCAD, Drafting

 

Professional Experience

 

November 2015 Present

Dynamic Management Solutions (DMS)

Los Alamos National Laboratory (LANL) TA-39, TA-54, TA-18

Los Alamos, NM

Hours per Week: 50

Salary: N/A

Supervisor: Mike Anderson Phone xxx-xxx-xxxx May Contact: N/A


Heavy Equipment Operator/Nuclear Waste Technician

 

Successfully perform broad array of nuclear waste remediation tasks including removing waste as well as controlling and loading out solid/liquid/hazardous materials/debris; also interface with LANL customers. Led D&D of LANL office space and performed roadwork and D&D of Sheba Reactor.

 

 

March 2015 October 2015

Clean Harbors

San Jose, CA

Hours per Week: 50-70

Salary: N/A

Page 1 of 5

Yyyyyy x. yyyyyy Page 2 of 5

 

Supervisor: Jeremy Serkin no longer with company Phone: N/A May Contact: N/A

 

Project Field Supervisor/Safety Officer

 

On daily basis conducted work-site walkarounds to manage safety, identify hazards and determine appropriate mitigating actions; authored detailed reports concerning any emergency response actions and performed Job Safety Analyses (JSAs). Employed subject matter expertise to monitor ambient air, set up/calibrate five gas monitoring systems, develop emergency evacuation plans, and author proposals/bids; additionally, was responsible for developing daily work planning/assignments and various safety audits.

 

Steered performance of crews that often numbered over 20 personnel; also managed any needed onsite safety/emergency responses, performed lock out/tag out and confined space safety procedures, and authored hazardous contingency and spill prevention plans.

 

 

March 2013 March 2015

Kiewit Construction

Tioga, ND / Albuquerque, NM

Hours per Week: 50-70

Salary: N/A

Supervisor: Cody Kite Phone: N/A May Contact: N/A

 

Civil/Grading Superintendent/Field Engineer

 

Proficiently led large equipment crew of 16 at the Paseo Del Norte Expansion project; collaborated with Safety Manager in presenting important Safety meeting to large equipment site workers to clearly disseminate relevant OSHA regulations covering shoring/trenching/sloping techniques; performed Job Hazard Analysis (JHA) and developed crucial safety action plans, providing safety team leadership (360 mindset safety procedures). Have developed in-depth understanding of crane and rigging procedures/terminology and provided team training in these areas to assure constant awareness of all safety-related issues as well as methodologies to improve workplace safety; also identified and mitigated multiple site hazards.

 

Was tasked to perform on-going heavy equipment operation as well as inspection and expertly supervised installation of utilities and underground high-pressure piping into Tioga Gas Plant Expansion. Performed/finalized grading and elevation checks, and was responsible for ensuring use of safe working practices; also held stop-work authority regarding all live utilities and high-pressure gas lines. Worked closely with clients regarding grading and building formats and served in mentorship/advisement role for junior personnel regarding grade checking and use of equipment.

 

 

August 2008 February 2013

Energy Solutions

Los Alamos, NM

Hours per Week: N/A

Salary: N/A


Yyyyyy x. yyyyyy Page 3 of 5

 

Supervisor: Vince Rodriguez Phone: 505.661.6621 May Contact: N/A

 

Project Quality Superintendent/Field Superintendent/Site Safety Officer for Treece, KS, Superfund Site

 

Expertly developed weekly reports for EPA PO Officer; working with minimal supervision continually interfaced with EPA clients/land owners and applied EPA regulations in compliance with construction safety CFR 1926. Skillfully performed wide array of sampling duties including monitoring air at lead and cadmium sites and managing all sampling data; also steered multiple special build activities for roads and retention basins, among others, and performed document control as well as all QC/QA actions to assure adherence to EPA specifications.

 

Worked closely with the Safety Manager and provided JHA as well as insight regarding safety action planning; managed/mitigated site hazards and ensured adherence to safety standards at job site. Built tracking programs to support waste disposal and managed grading, sloping and finish of all grading work; also was responsible for orienting new-hire personnel and all site operations.

 

 

Supervisor, Heavy Equipment/Nuclear Hazardous Technician for LANL TA-54/Area G

 

Proficiently managed RCRA waste storage areas; continually utilized expertise in chemical storage and materials segregation/handling concerning managing solid/liquid/hazardous/radioactive/mixed waste. Demonstrated understanding of LANL waste acceptance criteria as well as laboratory policies and waste administration requirements; ensured that inspection and characterization data was displayed on waste containers. Gained expertise in proper use of personal protective equipment including purifying respirators; assisted Pit38 in the disposal of MDA-B bins, received waste, performed general clean-up activities, assisted with portage of 375 box-line, performed decon/demob at 54 and TA-21 and conducted super sack disposal.

 

 

Operational Support Supervisor/Heavy Equipment Operator/Nuclear Waste Technician for TA-21/MDA-B

 

In this assignment, was tasked with multiple responsibilities including developing work schedules that included crew assignments, coordinating site waste disposal shipments, performing PPE inventory/ordering and, on daily basis, managing operations and conducting inspections. Directed the re-mobilization/relocation of movable enclosures and facilitated daily planning, IWD and safety meetings with site personnel/sub-contractors. Served as site QA/QC resource and ensured highest levels of safety performance by increasing site safety issue awareness levels.

 

Developed and continually utilized in-depth knowledge of facility operations/maintenance requirements for mechanical and electrical systems; also gained experience in the proper use of personal protective equipment including air purifying respirators (APR), SCBA, emergency escape bottle and lined air. Adroitly oversaw waste management for super sack policies/procedures, and interacted with LANL and sub-contractor management.


Yyyyyy x. yyyyyy Page 4 of 5

 

Lead Equipment Operator/Nuclear Waste Technician for TA-39 Ancho Canyon/LA Canyon

 

Successfully sorted/segregated PCB capacitors and trash from low-level waste stockpiles; loaded intermodels, assisted portage with sampling and loaded super sacks and trucks for transport.

 

 

June 2008 August 2008

Road Construction Northwest

Los Alamos, NM

Hours per Week: N/A

Salary: N/A

Supervisor: N/A Phone: N/A May Contact: N/A

 

Equipment Operator

 

Utilized strengths and experience in working with heavy construction equipment to excavate/haul various soils for use in construction of the Los Alamos Public Administration Building; skillfully excavated building footings and foundations and was responsible for laying pipe, checking grade and leveling soil as necessary.

 

 

May 2007 February 2008

Austin Commercial Industries

Los Alamos, NM

Hours per Week: N/A

Salary: N/A

Supervisor: N/A Phone: N/A May Contact: N/A

 

Lead Equipment Operator

 

As Lead Dirt Operator, skillfully excavated foundations/footings for the Radiological Laboratory Utility Office Building of LANL TA-55; also led snow removal team, served as CMMR Safety Lead and was member of the Zero Accident Team.

 

 

December 2004 May 2007

North Wind, Inc.

Los Alamos, NM

Hours per Week: N/A

Salary: N/A

Supervisor: N/A Phone: N/A May Contact: N/A

 

Equipment Operator/Drillers Helper

 

In this assignment effectively assisted drillers and served as a Grade Hopper, an Oilman/Flagger and an Operator/Laborer.


Yyyyyy x. yyyyyy Page 5 of 5

 

Education

 

University of New Mexico

Construction Management Degree; in progress

 

 

Certifications

 

1910. 40-hour HAZWOPER

Certified Environmental specialist

1910. 8-hour Supervisor HAZWOPER

Asbestos contractor/Supervisor

1926 10-Hour/OSHA

1926. 30-Hour Construction and Safety

1910. 30-Hour General Industry

Industrial Hygiene Basic

RCRA Certification

Portable Fire Extinguisher Use and Incipient Fire Fighting

Los Alamos National Labs Training

Forklift Operators License Class 5 Pneumatic Tires 15-Ton

Forklift Operators License Class 7 Rough-Terrain 30-Ton

DOT General Awareness Training

Adult/AED-CPR Course

Standard First-Aid Course

 

 

Trade Skills

 

Track-hoe/mini track-hoe

Dozers/4 way/ 6 way

Loader/wheel

Backhoe

Loader/skid steer

Forklift/All-Terrain/Industrial

Off-road trucks

Water trucks (and off-road)

Scrapers

Haul Trucks

Smooth drum

Sheep-foot

Soil Compacts-Cat-815

Rough-terrain forklift 30-ton

Blade/Motor-grader

15-Ton/Pneumatic-tire forklift

Snow cats

Snow maker machines

Brock Remote controlled excavators

Grapples and shears (D&D)

<< Previous           Back to Sitemap           Next >>

Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!

Click HERE!

Members Of The Following Resume Writing Associations:


BBB Rating : A+


Proud Sponsors Of:
 

 


 

For General Customer Service, Call Us Toll Free At 1-800-466-3076 Or Email Our Writers By Clicking HERE

 Resume Writing Group © 2005-.   All graphics & text on ResumeWritingGroup.Com are either owned or licensed by our company and may
not be reproduced without expressed, written consent.  Terms of service and rules for guarantees may be reviewed here...
*our resume writing Guarantee requires clients to save receipts as proof that they've submitted COPIES OF their NEW resume to a minimum of 40 employers USING OUR ADVICE.   REFUNDS ARE LIMITED TO RESUMES AND DO NOT INCLUDE ADDITIONAL SERVICES SUCH AS COVER LETTERS.REFUNDS CAN BE CLAIMED UP TO 90 DAYS AFTER PURCHASE.