Resume Writing ?

The Following Text Is An Unformatted Professional Resume Sample

From The Writers At The Resume Writing Group, Inc.

This Resume Has Not Been Formatted


ORDER YOUR OWN LETTER-PERFECT, JOB-WINNING RESUME AND IT WILL BE COMPLETED AS SOON AS YOU NEED!
Click HERE!



Yyyyyy x. yyyyyy

- 0000 xxxxxx xxxx , xxxx , xxxxx 00000 ( (xxx-xxx-xxxx * abc@xyz.com

 

Operations Manager (Oil & Gas)

Qualifications Profile

 

    Self-assured and results-driven petroleum engineer with more than 10 years providing well design & construction, production optimization, and project management in the oil & gas sector.

-    Proven efficiency in managing several oil wells concurrently over large drilling acreages (8,000 9,000 acres), optimizing performance of production assets, managing budgets of $94M - $500M annually, and introducing new drilling technologies that reduce oil well production costs by 10%, while increasing production by 20% and reducing failure rates by 19%.

-    Exceptional critical and forward thinking that strategize solutions to maximize oil & gas production, ensure compliance with industry and safety regulations, and resolve professional relationship and work issues.

    Exceptional resource management skill, multitasking and prioritizing work schedules to meet expectations.

    Excellent relationship building that creates teamwork synergies with clients, contractors/suppliers, management, and industry professionals in fulfilling shared commitments.

 

Professional Experience

 

Peregrine Petroleum Ÿ Houston, TX 2015 Present

Oklahoma Asset - Completion/Production Engineer 2013 Present

    Responsible for all non-op completion/production activities covering 375 wells with 2,240 BOPD/4,850 MCFD in Permian, North Dakota, and Oklahoma, collaborating with non-operated partners to assess completion plans, production projections, and outcomes, and optimizing completion designs in the Anadarko Basin using frac models, production analysis software, and technical research.

    Developed frac designs to address requirements based on well spacing, thickness, & reservoir properties of each well.

    Modeled and designed various types of stimulation treatments (slickwater, linear gel, x-link, HCFR) for all Peregrine wells, supervising completion activities involving frac, wireline, cleanout, and workovers in several locations.

    Negotiated all completion/production contracts to maintain/reduce cost to within 7% of AFE, evaluating completion plans, expense trends, and future well development under purchase consideration.

    Designed and scheduled workovers on gas lift, rod pump wells, optimizing production of 7 North Dakota wells with rod pump & plunger lifts.

North Dakota Asset - Project Team Lead Oct 2015 Present

    Managed North Dakota production asset consisting of a multi-disciplinary team of drilling, geology, reservoir, & land management skills, implementing a development plan for 8,500 acres, leading team efforts to evaluate and obtain an additional 3,000 acres within the area of interest.

    Monitored offset wells for completion and gathered production data to extrapolate economics for upcoming well construction and operation, working with the team in preparing acreage to be drilled, and providing management with monthly progress reports.

    Evaluated areas of interest for water cut, natural fractures, drainage areas, & OOIP calculations for economics to assist decision makers in committing to drilling orders.

 

Marathon Oil Co. Ÿ Bethpage, NY 2006 - 2014

Completion Engineer Bakken Asset Houston, TX Oct 2010 Sep 2014

    Authored standard operating procedures covering all aspects of completion and workover jobs for 4 drilling rigs, supervising workers in field locations involving frac, workover rigs, coiled tubing, wireline, liner runs, and working on subsurface, drilling, accounting, and land management to ensure that wells were completed on schedule & within the budget of $500M annually.

    Designed and implemented about 300 hydraulic fracture jobs for Bakken & Three Forks wells across the Williston basin, assisting in developing and implementing projects that introduced new technologies (fluid, tools, and chemicals) that accounted for 20% increase in production.

    Reduced costs by up to 10% on completions by lowering chemicals on fracs, removing unnecessary equipment, etc.

Reservoir Engineer Piceance Asset - Houston, TX Jul 2008 Oct 2010

    Developed the master plan for Marathon s 700 well Piceance Basin Asset consisting of 9,000 acre, establishing decline trends and quarterly production forecasts that led to re-evaluating b factors from 1.6 to 1.2, and providing management with multiple development scenarios for Piceance Basin.

    Collaborated with team members to enhance well productivity through improved characterization of the reservoir and understanding gas versus water zones.

    Administered the Piceance budget of $94M, identifying the economics in various production scenarios to optimize rate of return & net present value.

 

Yyyyyy x. yyyyyy

- 0000 xxxxxx xxxx , xxxx , xxxxx 00000 ( (xxx-xxx-xxxx * abc@xyz.com

 

Professional Experience

 

Production Engineer Permian Asset - Carlsbad, NM Jun 2006 Jul 2008

    Managed production of 117 oil & gas wells at the Indian Basin Field dealing with rod pumps, submersible pumps, and plunger lifts, working with pumpers daily to optimize the various production lift methods that decreased failure rates collectively by 19%, while increasing run times for sub-pump and rod-pump wells by 11% & 17% using capillary strings and chemical programs.

    Developed and executed procedures for multiple types of workovers & artificial lift designs, managing daily workovers rig operations in the field involving swabbing, slickline, artificial lift conversions, recompletes, acidizing, and paraffin/scale/corrosion mitigation.

    Collaborated with subsurface team members in successful field implementation of new horizontal recompletion programs, managing the SWD system that provided efficient daily disposal of thousands of barrels of water produced throughout the field.

 

Education & Credentials

 

B.S. in Petroleum Engineering, LOUISIANA STATE UNIVERSITY Baton Rouge, LA (2006)

 

Technical Skills

    Industry Software :Aries, Saphir, Topaze, SAP, Volts, Well View, WAM (Nodal Analysis), GOHFER, Spotfire, Well EZ, IHS Production Explorer & Enerdeq, Petra, Drilling Info, Terranaut, & Fekette Software Package

    MS Office Suite

Professional Training & Certifications

    Reservoir Engineering Petroleum Geology Tight Gas Engineering Hydraulic Fracturing Gas Lift Design

    Rod Pump Design Submersible Pump Design Frac Modeling PVT

    Stimulation of Horizontal Wells & Unconventional Reservoirs

Workshops, Presentations & Publications

    Presented two technical papers at the 2013 SPE Water Lifecycle workshop and 2014 Williston Basin Conference

    Participated as a committee member in the 2013 SPE Bakken Workshop

    Co-author: Lateral Wellbore Rock Characterization and Hydraulic Fracture Optimization Utilizing Drilling Cuttings and Mud Log in Cleveland Sand, a Case Study , SPE paper 185323

 

<< Previous           Back to Sitemap           Next >>

Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!

Click HERE!

Members Of The Following Resume Writing Associations:


BBB Rating : A+


Proud Sponsors Of:
 

 


 

For General Customer Service, Call Us Toll Free At 1-800-466-3076 Or Email Our Writers By Clicking HERE

 Resume Writing Group © 2005-.   All graphics & text on ResumeWritingGroup.Com are either owned or licensed by our company and may
not be reproduced without expressed, written consent.  Terms of service and rules for guarantees may be reviewed here...
*our resume writing Guarantee requires clients to save receipts as proof that they've submitted COPIES OF their NEW resume to a minimum of 40 employers USING OUR ADVICE.   REFUNDS ARE LIMITED TO RESUMES AND DO NOT INCLUDE ADDITIONAL SERVICES SUCH AS COVER LETTERS.REFUNDS CAN BE CLAIMED UP TO 90 DAYS AFTER PURCHASE.