Resume Writing ?
The Following Text Is An Unformatted Professional Resume Sample
From The Writers At The Resume Writing Group, Inc.
This Resume Has Not Been Formatted
ORDER YOUR OWN LETTER-PERFECT, JOB-WINNING RESUME AND IT WILL BE COMPLETED AS SOON AS YOU NEED!
Click HERE!
Specializing in Project Management, Start-Ups, I&C, Electrical, Calibration, PLC Programming & AutoCAD Design
Xxxxxx, XXXXXX xxxxxx │ (xxx-xxx-xxxx │ abc@xyz.com
Multi-Project Management │ Operations Management │ E / I Design │ E / I Technician │ AutoCAD │ EDDI Software
Field Engineering │ Team Building │ Training / Development │ PLC Programming │ Engineer Relations │ Compliaxxxxxxe
Field Crew Management │ Plant Start-Ups │ Constructability Review │ XXXXXXS System │ PLC │ P&ID Design / Preparation
Construction Activities │ Instrument Calibration │ Response Time Testing │ Elementary / Loop Designs │ As-Built Prep
Highly Accomplished Leader who directs multi-site, multi-project operations in alignment with a company s goals and who offers solutions-centric critical thinking for insightful, change-oriented results. Top Performer who implements I&C and electrical project designs at commercial nuclear power, petrochemical, nuclear fuel manufacturing, and uranium recovery pilot plants. Visionary Professional who rises above challenges within BWR and PWR nuclear power plant start-ups. Out-of-the-Box Thinker who has received multiple SPOT Awards for going above and beyond. Excellent Communicator who develops strong relationships with key decision-makers, industry peers, multi-levels of tradesmen, and clients. Former Member of the United States Coast Guard Reserve.
Professional Synopsis
NANA WorleyParsons 2009 Present
Contracted to British Petroleum, North Slope, AK │ Prudhoe Bay Oil Fields
P&ID Walk Down Lead (2013 Present)
Capitalize on the opportunity to lead forward-thinking North Slope, Prudhoe Bay initiatives, ixxxxxxluding mentoring and managing a top-performing team of 120 designers across all disciplines, as well as handling all initial employee recruitment, objective interviewing and hiring practices, performaxxxxxxe appraisals, and discipline actions.
Strictly complied with all BP contractual requirements.
Continually ensured all safety procedures were adhered to.
Project Manager │ As-Built Designer (2009 2013)
Strategically steered a five-year project tasked with updating over 5,000 P&IDs across mutable facilities on the North Slope of Alaska, ixxxxxxluding promoting the seamless field verification of each drawing and marking changes.
Expertly updated all drawings using AutoCAD 2012.
Led 4 walk-down teams of 8 designers in updating all drawings.
Successfully completed the rigorous project both on time and within budget.
System Research, Ixxxxxx. (SRI) 2008 2009
Contracted to NANA / Colt Engineering, LLC at BP, North Slope and Axxxxxxhorage, AK │ Alaska Updating Facilities
As-Built Designer
Spearheaded field-verified drawings and updated P&IDs, loop drawings, and data sheet drawings. Optimized project efficiexxxxxxies to manage Engineering Drawing & Document Information (EDDI) software database for drawings.
Demonstrated proven skill in the daily use of AutoCAD 2008.
Comprehensively checked documents in and out of EDDI system.
Yyyyyy x. yyyyyy
Specializing in Project Management, Start-Ups, I&C, Electrical, Calibration, PLC Programming & AutoCAD Design
Page Two │ (xxx-xxx-xxxx │ abc@xyz.com
Professional Synopsis (continued)
Granite Services International 2007 2008
Contracted to General Electric (GE), Wilmington, XXXXXX
Electrical │ Instrumentation Designer ESBWR Design
Utilized broad scope of industry knowledge toward collaborating with design engineers to develop a new Economic Simplified Boiling Water Reactor (ESBWR). Exhibited skill in comprehensively updating all data sheets.
Promoted synergistic E / I design support for PLCs and panel designs.
Expertly developed required drawings for Emergexxxxxxy Diesel building using AutoCAD.
Supported designs across nuclear, chemical, petrochemical, water, and waste water plant industries.
System Design & Integration, Ixxxxxx. 1998 2007
GNF Fuel Manufacturing Plant, Wilmington, XXXXXX
Project Manager │ Owner
Designed and implemented two large plate presses for NFS (Nuclear Fuel Services) at a GE site. Installed instrument and electrical hardware, designed and built PLC, and programmed software to run processes. Reinstalled plate presses at a Manitoba location in a Nickel Mine. Took the second press apart for Mississippi-based re-installation.
Completed a lucrative contract with U.S. Filter performing water clean-up.
Used various filter trailers and rebuilt trailers while sending staff to work at key sites.
Mentored and managed a details-centric team of 15 in exceeding electrical and instrumental projects.
Education & Professional Development
Cape Fear Technical Institute
Associate s Degree in Electronics
Waste Water License (No. 987064 │ Sixxxxxxe 2003) State of Xxxxxx
Electrical Contractor License (No. xxxxxx │ Unlimited │ Sixxxxxxe 1992) State of Xxxxxx
HazMat │ WMD Technician Surface Transportation (Sixxxxxxe 2015)
AutoCAD Training │ PLC Training Cape Fear Community College
Fire Apparatus │ Driver Operator BP North Slope Fire Department (Sixxxxxxe 2016)
Technical Summary
AutoCAD Software (2008 / 2012) │ XXXXXXS System │ PLC
EDDI (Engineering Drawing & Document Information)
Microsoft Office (Word, Excel, PowerPoint, Outlook) │ Visio
<< Previous Back to Sitemap Next >>
Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!